HRSG Gas Turbine Case Study

hrl: ensures efficient and compliant operation of major gas fired power station

Challenge

A major gas fired power station in Queensland needed engineering and site services to support the inspection and regulatory compliance of a heat recovery steam generator, and associated pressure parts including deaerators, drains flash vessels, and high energy pipework. With strict statutory requirements imposed by the Queensland state government, the client needed inspection advice to enable them to successfully and safely operate the generator for a period of four years until the next inspection outage.

Solution

Knowing that hrl: had a proven track record and the necessary equipment to complete this work, the client engaged hrl:to provide a risk-based materials engineering review of the condition of the heat recovery steam generator. hrl: then used this data to develop a cost-effective inspection program for a future major plant outage, covering the next four years of operation. With a focus on 'run, repair, replace' decisions, hrl: provided comprehensive insights into the state of major components and recommendations regarding future maintenance.  hrl: then provided a thorough project report on the condition of the plant including details of the inspections completed and the associated findings, a shopping list of work to be completed before the next inspection (including new designs to look at, repairs to be made, and parts to order), and finally, a compliance statement stating that the plant was found to be compliant with codes and standards and fit for operation until the next major inspection. Inspection procedures and programs were also updated in accordance with Australian standard and Queensland state legislation.

Results

This inspection program was applied on site during a planned outage, and the work was completed within time and budget. The advice provided by hrl: has ensured that the plant will retain its integrity and compliance for at least a further four years of operation. hrl: 'run, repair, replace' methodology provided the plant operator with the assurance of regulatory compliance and the flexibility to keep the plant in operation, thereby maximising financial return. The client was satisfied with the work completed, and has continued to engage hrl: services.

 

 

 

John EdgleyAuthor:John Edgley
About: Principal Materials Engineer John has More than 35 years' experience in all aspects of power stations worldwide, from original manufacture through to statutory inspections. Specialising in material selection, risk based inspection regimes, and flaw detection. Responsible for run, repair, replace decisions on major high temperature, high pressure plant. Outage planning and management.
Connect via:LinkedIn
Tags:ReliabilityEfficiency

What Our Clients Say

"Specialised skills and industry knowledge. Excellent services available at your doorstep."

Tanveer Hasan
Read All

See expertise in action:

Ready to transform your business performance?

Contact our technical consultants on -
+61 3 9565 9888
or
info@hrl.com.au to get started today.

Our Certifications

NATA

NATA accredited AtS/NZS ISO 17025, AS/NZS ISO 17020NATA Accredited Laboratories number 561

ISO 9001 Quality Management

ISO 9001 Quality Management certified by BSI under certificate number FS605116.