Dry Bottom Ash Handling Case Study
HRL improves safety and reduces water consumption at Muja Power Station
Challenge
Solution
Synergy engaged HRL to design, construct, import, install, and commission three Dry Bottom Ash Handling Systems (DBAHS) on Units 5, 7, and 8. These DBAHS (researched, designed, and developed in conjunction with a Chinese supplier), crush, remove, and air cool hot ash without the need to water quench resulting in a dry product that can be transported via truck, and potentially used in road base.
The DBAHS was fully integrated into the existing computer operating system of the power plant, and has also made it much easier to handle the removal of large ash deposits crushing the ash to the size of a football which is easily removed to maintain continued operation.